List of References (2019-2015)
Project
Location
Year
Position
Duties
|
Failure analysis of a power transformer in CCP of Santo Domingo
China
2019
Power Transformer expert
Factory Acceptance Tests of 230 kV 40 MVA single phase Power Transformers
|
Project
Location
Year
Position
Duties
|
Design Review of a Power Transformer.
Portugal
2019
Power Transformer expert
Design Review of 230 kV 120 MVA Power Transformer
|
Project
Location
Year
Position
Duties
|
Power Transformer Repair
Perù
2019
Transformer Expert
Direction of the repair work in a power transformer
|
Project
Location
Year
Position
Duties
|
Oil Analysis and Maintenance Software
Perù
2019
Transformer Diagnosis Expert
Software supply and technology transfer in transformer dielectric oil diagnosis.
Creation of a database for the transformers population.
|
Project
Location
Year
Position
Duties
|
Transformer Factory Upgrade
Egypt
2019
Transformer Expert
Feasibility analysis of the factory upgrade from 245 kV to 550 kV power transformers
|
Project
Location
Year
Position
Duties
|
Failure Analysis of a Synchronous Motor
Germany
2019
Electric Machines Expert
Failure analysis of 18 MW synchronous motor
|
Project
Location
Year
Position
Duties
|
Power Transformer active part inspection
Perù
2019
Transformer Expert
Active part inspection on a faulted transformer
|
Project
Location
Year
Position
Duties
|
Synchronous Generator Factory Tests
USA
2018
Electric Machines Testing Expert
Factory test son 240 MVA synchronous generator
|
Project
Location
Year
Position
Duties
|
Power Transformers Procurement
Perù
2018
Lecturer
“Semana del Capítulo de Ingeniería eléctrica, 01 al 04 octubre 2018”
Exposition of the topic: Power Transformers Procurement Process, actual conditions.
|
Project
Location
Year
Position
Duties
|
Power Transformers Maintenance Workshop
Perù
2018
Lecturer
Workshop on power transformers maintenance, focused in insulating oil analysis and diagnosis
|
Project
Location
Year
Position
Duties
|
Power Transformers Life Extension.
Italy
2018
Power Transformer Diagnostic and Maintenance expert
For a population of 60 power transformers in 6 power plants, including 400 kV step up transformers and HV/MV
transformers, it was established the residual life and the condition of the population to evaluate a possible life
extension of 10 years.
For the automation of the process, a database of the available oil analysis history population was created
|
Project
Location
Year
Position
Duties
|
Power Transformers Diagnostic and Maintenance.
Italy
2018
Power Transformer Diagnostic and Maintenance expert
For a 150 power transformers population in an industrial plant, including 400 kV step up transformers of 600 MW power
station, HV/MV MV/MV and MV/LV transformers, it was established a maintenance program, including a diagnostic analysis
tool based on DGA and oil analysis, to monitoring the condition of the population in terms of:
a) Transformer condition assessment
b) Insulating oil assessment
c) Residual life
For the automation of the process, a database of the available oil analysis history population was created
|
Project
Location
Year
Position
Duties
|
Quality Assurance in a Power Transformer Procurement.
Italy
2018
Power Transformers expert
The Quality Assurance in the Procurement of 240 MVA 400 kV step up power transformer included:
a) Technical specification
b) Design review
c) Manufacturing inspections
d) Acceptance tests inspection
|
Project
Location
Year
Position
Duties
|
Stator bars failure analysis of large Power Station Generator
Italy
2017
Generator diagnostics expert
Root cause study of stator bars insulation damage in a 320 MVA power station generator.
|
Project
Location
Year
Position
Duties
|
Design Review of a Power Transformer.
Perù
2017
Power Transformer expert
Design Review of 220 kV 110 MVA Power Transformer
|
Project
Location
Year
Position
Duties
|
Power Transformer Failure Analysis.
Perù
2017
Power Transformer expert
Failure Analysis of 220 kV 110 MVA Power Transformer
|
Project
Location
Year
Position
Duties
|
Condition assessment of MV cables.
Perù
2017
MV cables diagnostics expert
Condition assessment of two lines with MV cables feeders to one mine mill
|
Project
Location
Year
Position
Duties
|
Design Review of four power transformers.
China
2017
Transformer design expert
Design review of four HV (500 kV) power transformers
|
Project
Location
Year
Position
Duties
|
Condition assessment of power transformers.
Italy
2017
Transformer diagnostics expert
Condition assessment of two step-up 400 kV power transformers
|
Project
Location
Year
Position
Duties
|
GIS diagnostics after installation
Brazil
2016
GIS testing expert
Field PD diagnostic testing (acoustic method) of GIS after installation
|
Project
Location
Year
Position
Duties
|
Failure analysis of a power transformer.
Italy
2016
Transformer design expert
Failure analysis of a step-up 400 kV power transformer
|
Project
Location
Year
Position
Duties
|
Design Review of power transformer.
Germany
2016
Transformer design expert
HVDC 400 kV AC 500 kV DC power transformer design review
|
Project
Location
Year
Position
Duties
|
Power Transformers design Software.
Spain
2015
Transformer design expert
Customized Transformer Design Software developed for a transformer manufacturer
|
Project
Location
Year
Position
Duties
|
Condition Based Maintenance of power transformer.
Spain
2015
Transformer condition assessment expert
Definition of CBM models for power transformer condition assessment
|
Project
Location
Year
Position
Duties
|
Design Review of power transformer.
China
2015
Transformer design expert
Design review of three phase power transformer, 110 MVA 220/23 kV
|
Project
Location
Year
Position
Duties
|
Design Review of power transformer.
Portugal
2015
Transformer design expert
Design review of three phase/three loadable windings power transformer, 75 MVA 230/115/34.5 kV
|
Project
Location
Year
Position
Duties
|
Failure analysis of a power transformer in CCP of Santo Domingo
Dominican Republic
2015
Transformer design expert
Failure analysis of a power transformer explosion.
Live testimony in the Dominican Republic Court of Justice.
|
Project
Location
Year
Position
Duties
|
Failure analysis of a power transformer in CCP of Santo Domingo
Dominican Republic
2015
Transformer design expert
Hudbay (Perú)
|